[Badminton] Grade II & III Indoor Lighting Retrofit Project

SCHOOL BADMINTON HALL LIGHTING RETROFIT

CPS Lighting designs and supplies sports lighting systems. At Longgang Experimental School, CPS renovated the lighting for an indoor hall with nine badminton courts used for PE lessons, student training and campus amateur matches. The project configuration lists 32 × 240 W CPH200 Series LED lights in a bilateral side layout.

The original account reports average illuminance above 750 lx across the nine courts and uniformity above 0.6. The installed LED ratings total 7.68 kW, calculated. The design objective combined useful court coverage, improved upward viewing conditions and a lower lighting load.

Request a Free DIALux SimulationSee the Product Reference

Share your court plan and mounting details. The simulation depends on those inputs; the installed result requires site verification.

Badminton players on green courts beneath roof lights, with green spectator seating behind them
Badminton play beneath the upgraded lights

9 courts

School PE, training and amateur matches

32 × 240 W

Documented CPH200 Series configuration

7.68 kW

Combined rated power, calculated

1. School badminton with a defined retrofit brief

The original installation comprised 116 metal halide lamps rated at 400 W each. The school’s brief described uneven brightness, glare, flicker and high electricity consumption. The replacement needed to support everyday teaching as well as training and matches, with less disruption from lighting maintenance.

Project itemOriginal systemLED retrofit
Light sources116 × 400 W metal halide lamps32 × 240 W LED luminaires
Documented LED familyNot applicableCPH200 Series
Listed rating total46.4 kW, calculated7.68 kW, calculated
Court coverageNine badminton courtsNine badminton courts
Layout recordExact old coordinates unavailableBilateral side arrangement

On narrow screens, swipe the configuration table horizontally.

2. Position light around the upward playing view

The supplied configuration specifies a bilateral side layout intended to address glare during badminton. Players repeatedly look upward to track the shuttle, so fixture position and aiming matter alongside light reaching the court. The photographs show the courts, spectator seating and lighting rows beneath a steel roof.

These images document one completed project, rather than a controlled before-and-after test. They do not provide exact mounting heights, coordinates or beam selections. For a similar school hall, model the court markings, roof structure, windows and likely player sightlines before setting fixture positions.

Players and parallel badminton nets below rows of roof lights beside green spectator seats
Courts beside the spectator seating
View along green badminton courts toward the far wall beneath the steel roof and lighting rows
View along the courts toward the far wall
Players across badminton courts beneath rows of lights and a steel roof, with green seats at the side
School badminton beneath the lighting rows
Badminton practice on green courts with a basket of shuttlecocks, nets and overhead lighting
Practice on the green badminton courts

3. Reported lighting results and a transparent power comparison

The brief specifies average illuminance ≥750 lx and U2 uniformity ≥0.6. Its outcome paragraph reports all nine courts above those thresholds. The complete signed measurement report, grid, ratio definition and numerical glare or flicker readings are not supplied. These remain reported project results, rather than independently verified acceptance data.

The old article describes Class II training and Class III match objectives. Those descriptions do not establish complete compliance from two figures alone. A new project should agree the applicable lighting criteria and measurement method for its intended activities before commissioning.

ComparisonCalculated value
Original lamp ratings116 × 400 W = 46.4 kW
LED luminaire ratings32 × 240 W = 7.68 kW
Difference in listed totals38.72 kW
Reduction in listed rated power(46.4 − 7.68) ÷ 46.4 = 83.4%

The 83.4% figure is a comparison of listed equipment ratings, not a metered electricity saving. Undocumented ballast losses are excluded from the old total. Circuit measurements, operating hours and control settings are needed to establish actual consumption, annual savings or payback.

4. CPS design, supply and project coordination

The case attributes the LED renovation to CPS and describes survey, optical design, delivery, installation and commissioning activities. For a new school project, confirm the division of installation responsibilities, electrical interfaces and access arrangements, then schedule the work around lessons and venue use.

CPS’s published OEM/ODM capabilities cover metal processing, finishing and assembly. Its testing laboratory lists electrical, optical and environmental equipment. These are company capabilities; proposed product tests, acceptance checks and warranty terms need confirmation for each supply.

5. Historical configuration and a separate current reference

Installed configuration: CPH200 Series, 32 units rated at 240 W. The source configuration identifies the series, but not a complete model suffix, driver or optical specification. These details require the historical order or datasheet.

Current Dubhe 200W projection light with two lens modules and an adjustable metal bracket
Current catalogue product reference

Dubhe Projection Light — 200 W

Current catalogue reference only; distinct from the installed CPH200 Series 240 W lights.

Catalogue itemPublished reference
Rated power200 W
Luminous flux30,000 lm
Colour temperature5700 K
Colour renderingRa ≥ 80
Listed beam angle45°
Ingress protectionIP66

View product details

This reference illustrates a current CPS option for discussion. It is not presented as the historical product or a direct replacement. Suitability for badminton depends on photometric modelling, mounting geometry and the agreed glare assessment.

6. Plan your school badminton hall retrofit

Send a floor plan, court count and markings, clear height, mounting positions, photographs and intended playing level. Include teaching hours, installation access and any camera requirements. For an energy comparison, add the existing lamp and ballast schedule, controls and electricity records.

Request a Free DIALux Simulation

Share your court plan and mounting details. The simulation depends on those inputs; the installed result requires site verification.