The Hangzhou Olympic Sports Centre lighting project included 396 poles, including 296 multifunctional smart poles, serving three venues built for Hangzhou.
The main arena, aquatics centre and training hall at Hangzhou Olympic Sports Centre share an extensive outdoor circulation network. CPS Lighting developed the lighting scheme and supplied equipment, and a CPS group subsidiary implemented the project. The pole design took its cues from the lotus forms of the venue architecture.

A family of pole heights
The scheme used poles measuring 4, 6, 8 and 10 m. Installation covered ground level and the 8 m podium around the main arena and aquatics centre, plus ground-level areas around the training venues. Of 396 lighting poles documented, 296 were multifunctional smart poles.
Lighting and network operations
A common pole design accommodated different modules and mounting heights. Networked operation allowed the venue team to manage the system across different spaces. For a similar venue, map functions to the actual routes and public spaces and agree which devices each pole needs before finalising the pole schedules.
Project images










Plan smart poles for a venue
Send a site plan identifying arrival routes, elevated podiums, queuing areas and service access. Agree lighting scenes for event and non-event operation, then coordinate device clearances, structural loads, cable routes and network handover.